MECHANICAL & PIPING

 

March 2019 to June 2019 :                   SHUT DOWN AIR LIQUIDE

  • Safety and Security protocol
  • Day to day follow up
  • Analysis of regulatory requirements
  • Analysis of the potential dysfunctions / Proposal of solutions
  • Monitoring of regulatory applications
  • Planning & Supervision

 

March 2018 to December 2018:         ARKEMA

  • Technical requirements
  • Safety and Security protocol
  • Analysis of proposed solutions / Technical modifications
  • Analysis of regulatory requirements
  • Analysis of the potential dysfunctions / Proposal of solutions
  • Monitoring of regulatory applications
  • Preliminary Inspection files
  • On-Site Monitoring

 

January 2018 to February 2018:       SEGULA TECHNOLOGIE - Mission TOTAL Donges

  • Establishment of a standard procedure defining the working methods and principles for cladding operations. (Weld Overlay, Hot/Cold Roll Bonding, Explosion, Weld Cladding...) and Lining
  • Drafting of general work procedures on three different workshops,
  • Drafting of technical specifications for consultation of making changes on Pressure Vessel Equipment
  • Integration of the new European Directive equipment 2014/68/EU in lieu of the 97/23/EC European Directive and of the Decree of 15 March 2000
  • g piping drafting procedures
  • Writing & update of data sheets and document review PID
  • Isometrics / TIE Ins review

 

December 2012 to June 2013 :          TEREOS – CONNANTRE PROJECT

  • Analysis of all documentation (PID, functional notes, Isometrics..)
  • Writing of requisitions
  • Suppliers documentation analysis
  • On-site monitoring – 8,5 M€ - 4 Lots – 3 Companies

 

January 2005 to April 2006 :              RUMP

  • Design, construction and Installation of Mechanical equipment
  • Design of a working plate-form (60 m²) at +40 m
  • On-site monitoring (Bestfood, Beer Industry)

 

 

November 2001 to December 2004 :                     LINDE

  • Design, Construction and Monitoring of Gases Distribution framework
  • Audit of gases distribution framework

 

July 1998 to November 2001 :           QUIRI

  • Design of pressure vessels and tubular heat exchanger
  • Mechanical calculation of pressure vessels and tubular heat exchanger (primary only)
  • Thermal calculation of tubular heat exchanger (B-Jack, specific Quiri program)
  • Follow-up of equipment construction
  • After Sales services (on-site modifications)

 