ENERGY / ENVIRONMENT / NUCLEAR
July 2014 to October 2014 : CEGELEC
- Check of process data
- Realization of an Excel software for BOQ definition (Valves, piping, flanges, Instrum…)
- Standardisation of PID to have exactly the same numbering system from one unit to the other (to help on programming & functioning notes)
- Realization of a standard Piping Class (Calculation according ASME + EN 13480)
- Piping Class definition done (Piping, elbows, main valves…)
- Writing of the final notification document in order to allow others people to use the Piping Class Standard for new items.
June 2013 to June 2014 : CNIM – Various PROJECTS
- Conception and writing of commissioning procedures on various French and English projects
- Improvement & Standardisation of main documentation
- Writing of the Commissioning Management Plan
- On-site visit
- On-site tests
January 2011 to December 2011 : AREVA – Cryogenics / Ultra-Filtration
- Technical requirements
- Monitoring achievement project
- Analysis of proposed solutions
- Technical modifications
- Analysis of regulatory requirements
- Analysis of provided equipment
- Analysis of the potential dysfunctions
- Proposal of solutions
- Monitoring
- Safety & security Management
April 2008 to January 2010 : ALSTOM – ENGINEERING MANAGER
- Audit thermal power plant KOSOVO II
- Design of DESP examination on EPR project
- Many studies on Marsat project (Algeria)
June 2006 to November 2007 : ALSTOM – PROJECT ENGINEER SOHAR
- Supplier follow up (located in Switzerland)
- Analysis of supplier documents (PID, PFS, Data sheet)
- Non conformity follow up
- On site supplier Inspections
- Operating Maintenance Manual writing