FOOD & BEVERAGE / PHARMACEUTICAL
l
December 2012 to June 2013 : TEREOS – CONNANTRE PROJECT
- Analysis of all documentation (PID, functional notes, Isometrics..)
- Writing of requisitions
- Suppliers documentation analysis
- On-site monitoring – 8,5 M€ - 4 Lots – 3 Companies
- Writing of main intervention procedures
- Design, construction and Installation of Mechanical equipment
- Improvement proposal
- On-site safety and working progress supervision
- Realization of main documentation for suppliers follow up
- Realization of main documentation for temporary check and final reception follow up
- Realization of all registration documents (progress, supplementary work follow up…)
- On-site re-engineering for correction of non-valid study documents and missing equipment
January 2005 to April 2006 : RUMP
- Design, construction and Installation of Mechanical equipment
- Design of a working plate-form (60 m²) at +40 m
- On-site monitoring (Bestfood, Beer Industry)
April 1997 to April 1998 : RHEO MIX
- Design and follow-up of a complete separation and purification Papaine Unit, by Industrial Chromatography :
- Analysis of the recipe for the customer laboratory
- Industrial Protocol definition
- Calculation of different equipment (tanks, pumps,…)
- Technical Specifications for suppliers and providers consulting
- Analysis of suppliers proposal, and choice of the provider
- Monitoring of manufacturing equipment
- Writing of the Organisation and Maintenance Manual