OIL & GAS
January 2018 to February 2018: SEGULA TECHNOLOGIE - Mission TOTAL Donges
- Establishment of a standard procedure defining the working methods and principles for cladding operations. (Weld Overlay, Hot/Cold Roll Bonding, Explosion, Weld Cladding...) and Lining
- Drafting of general work procedures on three different workshops,
- Drafting of technical specifications for consultation of making changes on Pressure Vessel Equipment
- Integration of the new European Directive equipment 2014/68/EU in lieu of the 97/23/EC European Directive and of the Decree of 15 March 2000
- g piping drafting procedures
- Writing & update of data sheets and document review PID
- Isometrics / TIE Ins review
October 2015 to December 2015 : TECHNIP
- Preliminary calculation notes ASME II / ASME III + GOST (Russian Code)
- Mechanical data sheets
- Requisition prior to consulting
- Suppliers proposal analysis
- Suppliers follow up SIBUR Project :
December 2014 to May 2015 : SAIPEM
- Preliminary calculation notes (ASME II + WRC 107)
- Mechanical data sheets and requisition prior to consulting
- Standardization of Mechanical data sheets of Pressure Vessel for each material main type (Carbon steel, Stainless Steel, SA-738, SA-537…) and position (Horizontal / Vertical)
- Improvement of heat exchanger Mechanical Data Sheet based on Pressure Vessel data-sheets + Improvement of Process Design conditions
- Load tables for checking of Blast / Motion calculations
February 2012 to June 2012 : LGI
- Check of drawing for consulting
- Technical requisitions
- Choice of suppliers' panel for consulting
- Technical & Financial Analysis of proposals
- Technical alignment
- Management of drawing & calculation team
- Analysis of regulation criteria
- Analysis of equipment criteria
- Analysis of potential malfunction
- Analysis of different scenarii for construction and supply according supplier location (costs & delays)
Add a comment