MECHANICAL BOILER & PIPING CONSTRUCTION MANAGER

  • Analysis of customers’ specifications
  • Technical Specifications for consulting of providers and suppliers
  • Selection of suppliers
  • Proposal for improvements and up-grading
  • Technical and financial proposal
  • Thermal Calculation for Boilers and Heat Exchangers
  • Pressure Calculation (CODAP, ASME, ADM…)
  • Construction & On-Site Monitoring
  • Conception of security protocols
  • On-site & construction protocols
  • Meetings with Notified Organisms (APAVE, LLOYDS…)

 

March 2019 to June 2019 :                   SHUT DOWN AIR LIQUIDE

  • Safety and Security protocol
  • Day to day follow up
  • Analysis of regulatory requirements
  • Analysis of the potential dysfunctions / Proposal of solutions
  • Monitoring of regulatory applications
  • Planning & Supervision

 

March 2018 to December 2018:         ARKEMA

  • Technical requirements
  • Safety and Security protocol
  • Analysis of proposed solutions / Technical modifications
  • Analysis of regulatory requirements
  • Analysis of the potential dysfunctions / Proposal of solutions
  • Monitoring of regulatory applications
  • Preliminary Inspection files
  • On-Site Monitoring

 

January 2018 to February 2018:       SEGULA TECHNOLOGIE - Mission TOTAL Donges

  • Establishment of a standard procedure defining the working methods and principles for cladding operations. (Weld Overlay, Hot/Cold Roll Bonding, Explosion, Weld Cladding...) and Lining
  • Drafting of general work procedures on three different workshops,
  • Drafting of technical specifications for consultation of making changes on Pressure Vessel Equipment
  • Integration of the new European Directive equipment 2014/68/EU in lieu of the 97/23/EC European Directive and of the Decree of 15 March 2000
  • g piping drafting procedures
  • Writing & update of data sheets and document review PID
  • Isometrics / TIE Ins review

 

April 2017 to August 2017 :                SANOFI – ESP REMEDIATION

  • Realization of technical requisitions & analysis of providers documents
  • Handling of "orphans" files for 2015/2016 - resolutions of the problems
  • Analysis of regulatory literature for the realization of the statements in Service
  • Realization of the missing regulatory files

 

October 2015 to December 2015 :    TECHNIP - SIBUR Project

  • Preliminary calculation notes ASME II / ASME III + GOST (Russian Code)
  • Mechanical data sheets
  • Requisition prior to consulting
  • Suppliers proposal analysis
  • Suppliers follow up

 

December 2014 to May 2015 :            SAIPEM - Mozambique Project

  • Pressure Vessels calculation for a FLNG (Pressure + Blast + Motion)
  • Writing of Mechanical Data-sheet
  • Writing of Technical requisitions
  • Proposal Analysis:

 

January 2005 to April 2006 :              RUMP

  • Design, construction and Installation of Mechanical equipments
  • On-site monitoring

 

November 2001 to December 2004 :                     LINDE

  • Design, Construction and Monitoring of Gases Distribution framework
  • Audit of gases distribution framework

 

July 1998 to November 2001 :           QUIRI

  • Design of pressure vessels and tubular heat exchanger
  • Mechanical calculation of pressure vessels and tubular heat exchanger (primary only)
  • Thermal calculation of tubular heat exchanger (B-Jack, specific Quiri program)

 