NEO2

 

CONSULTANT – PROCESS / MECHANICAL

 

October 2015 to December 2015:       TECHNIP – CALCULATION ENGINEER

  • Description : Mechanical calculation notes of equipment (Pressure Vessel / Shell & Tubes Heat Exchangers) for SIBUR project
  • Challenge : Around 30 different equipment, in both Pressure, + Mechanical data sheets + requisitions

 

Decembre 2014 to May 2015 :              SAIPEM – CALCULATION ENGINEER

  • Description : Mechanical Calculation notes on several pressure vessels equipment (60 to 80)
  • Challenge : Preliminary Design notes + Blast + Motion + Mechanical Data sheets + Requisitions

 

September 2014 & October 2014 :      CEGELEC - CALCULATION ENGINEER

  • Description : Realization of a standard Piping Class
  • Challenge : to define a Piping Class Standard mixte ASME / EN which could be used on different projects

 

June 2014 to October 2014 :                CEGELEC - PROCESS ENGINEER

  • Description : Dam Renovation in Mozambique
  • Challenge : to replace the Engineer in charge of the project during the time she was on maternity period.

 

June 2013 to June 2014 :                      CNIM – COMMISSIONING ENGINEER

  • Description : Conception of cold commissioning procedures on several waste facility projects all based in England
  • Challenge : writing of 30 cold commissioning’ procedures 6 to 10 months before starting of commissioning – delay : 8 to 10 weeks for each project

 

December 2012 to June 2013 :            TEREOS – ON SITE PIPING SUPERVISOR

  • Description : Supervision on a major piping upgrading project in a sugar plant
  • Challenge : on-site re-engineering due to engineering company mistakes during project steps

 

 

 